How Long Does It Take to Remodel a Kitchen? The Basics Explained

How Long Does It Take to Remodel a Kitchen? The Basics Explained

The average homeowner spends nearly $64,000 on a kitchen remodeling project, but spending this money is worthwhile. After all, it can significantly increase a home’s value.

If you’re thinking about going through a project like this, you might be asking, “how long does it take to remodel a kitchen?”

The answer depends on several factors, and here is a guide to help you know how long it might take to remodel your kitchen.

The Design and Planning Stage

A good portion of the time spent on the kitchen remodel process involves designing and planning the project. Your kitchen remodel timeline begins here, and this stage can take anywhere from a few weeks to a few months.

Designing the kitchen you want to have is an integral step of the process, as it decides what your project involves. You’ll want to take your time during this step to make sure you get the kitchen you want and need.

You can contact this company for help with the design. After designing it, you’ll need to plan the project, and you’ll need a contractor to help with this step.

The Materials

The next step of remodeling a kitchen is ordering the materials. A kitchen remodel requires a lot of materials, and some might take weeks to get.

For example, are you replacing the cabinets? If so, it might take four to six weeks to get them. You won’t want to start the project, though, until you have them and all the other materials you need.

Remodeling a kitchen also requires other materials. You might need to order new flooring, light fixtures, and plumbing fixtures. If you want your kitchen to look great, you might also want to order new appliances.

Obtaining all these materials might take four to six weeks, but it’s always better to wait to begin the project until after you have everything you need. By doing it this way, the rest of the project will run faster and smoother.

The Work and the Contractor

Once you have everything you need, your contractor can begin the work with the first stageโ€”the demo process. To get a new kitchen, you must remove all of the old parts.

Next, the contractor will begin installing all the new parts to your kitchen. They might work on the cabinets first, then the flooring. They might finish the project by installing the countertops.

The amount of time needed for this step depends on several things. First, how many workers will be there? If there is only one, it will take longer. Secondly, it depends on the amount of work you’re doing.

You can expect this step to take at least two to three weeks, but it could be longer.

How Long Does It Take to Remodel a Kitchen?

Are you still wondering, “how long does it take to remodel a kitchen?” The answer is that you might be able to complete the job anywhere between one to six months.

Hiring a good contractor is vital and planning the project is also essential.

If you enjoyed this article a lot, check out the rest of our blog today!